TITLE: 03/14 day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Unknown INCOMING OPERATOR: Jeff SHIFT SUMMARY:' LOG: :20 Chris S 400 yds from corner station; X-arm beam enclosure sealing project; all day work. 17:00 Reibolt on site for grouing. 16:09 Hugh and John into the LVEA 09:18 Fil into LVEA to find John for work permit sign-off 17;37 Hugh Done at EX; breif stop in at LVEA and then to EY 17:39 Christina and Karen headed to EX 17:45 Fil and TJ into LVEA to pull cable 18:25 Lights on at EY 18:27 Jeff out of LVEA 18:35 Karen and Christina leaving EX and headed to EY. 18:55 Fil and TJ out of LVEA for lunch 19:08 Dave barker executing WP 5775 19:18 Hugh back from EY and going into toe LVEA 19:26 Hugh out