Reports until 15:43, Monday 14 March 2016
H1 General
edmond.merilh@LIGO.ORG - posted 15:43, Monday 14 March 2016 (26060)
Shift Summary - Day
TITLE: 03/14 day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Unknown
INCOMING OPERATOR: Jeff
SHIFT SUMMARY:'
LOG:
:20 Chris S 400 yds from corner station; X-arm beam enclosure sealing project; all day work.
17:00 Reibolt on site for grouing.
16:09 Hugh and John into the LVEA
09:18 Fil into LVEA to find John for work permit sign-off
17;37 Hugh Done at EX; breif stop in at LVEA and then to EY
17:39 Christina and Karen headed to EX
17:45 Fil and TJ into LVEA to pull cable
18:25 Lights on at EY 
18:27 Jeff out of LVEA
18:35 Karen and Christina leaving EX and headed to EY.
18:55 Fil and TJ out of LVEA for lunch
19:08 Dave barker executing WP 5775
19:18 Hugh back from EY and going into toe LVEA
19:26 Hugh out