Reports until 15:54, Tuesday 15 March 2016
H1 General
edmond.merilh@LIGO.ORG - posted 15:54, Tuesday 15 March 2016 (26085)
Shift Summary - Day
TITLE: 03/15 day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Jeff
SHIFT SUMMARY:'Maintenance
LOG:
14:15 Chris S; X-Arm beam tube sealing; 300 yards from end station. (morning work)
15:00 Grouting in LVEA
15:48 Hugh out to LVEA work around HAM2. Jim handling ISI damping.
16:30 Fil into LVEA to do WP5778
16:27 Bubba going to MX and EX with Cintas people.
16:45 NORCO on site with LN2 load for EX
17:00 Fil called from LVEA. Key Lock is intslled on TCS Y and by Kiwamu's instruction, ENABLED. FIl heading to do the same for TCS X.
17:15 Water Delivery
17:29 Second LN2 truck on site
17:43 Fil back from LVEA. TCS Y Key Lock done. Heading back out to execute WP5735
18:19 Joe, Sheila and Hang out to LVEA
18:40 Joe out of the LVEA
19:05 Truck here to pick up rental equipment
19:00 Fil out of LVEA for lunch
20:53 Carlos to reboot all workstations at end stations
21:18 Joe back into the LVEA
21:30 Fil and Manny out of LVEA
21:40 Joe out
21:55 Jeff to both end stations
22:18 Gerardo to MY/CP3 for manual fill
22:24 Fil out to LVEA to retrieve cables
22:30 Bubba out of fan room headed to EX
22:35 Gerardo is back from MY/CP3