Reports until 16:01, Wednesday 16 March 2016
H1 General
edmond.merilh@LIGO.ORG - posted 16:01, Wednesday 16 March 2016 (26104)
Shift Summary - Day
TITLE: 03/16 day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Jeff
SHIFT SUMMARY:'
LOG:
14:00 Chris working in fan room (#5) in corner station. (morning work)
15:30 Gerardo to mechanical room to start his "rounds"
16:18 Fil going out to shutter PSL light pipe
16:19 Manny and Lesly going to finish up cabling work around BSC2
17:11 Gerardo back
17:50 Joe into LVEA to check first aid kits
18:11 Joe out of the LVEA
18:21 Betsy beginning charge measurements on end station test masses
20:20 Fil and JoeD out to LVEA
20:30 Joe out
21:15 Gerardo and Patrick out to End stations
21:16 Carlos out to LVEA
21:25 Fil and Carlos out of LVEA
21:26 FIl opening the shutter on the light pipe
21:31 Betsy out to the LVEA