TITLE: 03/17 day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
Wind Avg: 9 mph
Primary useism: 0.03 μm/s
Secondary useism: 0.21 μm/s
Summary: Grouting in LVEA till about lunch then to EX.