Transition Summary: Title: 03/17/2016, Evening Shift 23:00 – 07:00 (16:00 – 00:00) All times in UTC (PT) State of H1: IFO unlocked. Planned Engineering Commissioning: No commissioning work planned for tonight. Grouting at End-X. Electrical work in LVEA. Outgoing Operator: TJ