1/2 open LLCV bypass valve, and the exhaust bypass valve fully open.
Flow was noted after 10 minutes and 10 seconds, closed LLCV valve, and 3 minutes later the exhaust bypass valve was closed.
Next over-fill on Saturday, March 19th before 23:00 utc.
The manual valve setting was increased from 15 to 18% to help compensate for this increased boiloff.