TITLE: 03/18 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Planned Engineering OUTGOING OPERATOR: Mar CURRENT ENVIRONMENT: Wind: 10mph Gusts, 6mph 5min avg Primary useism: 0.09 μm/s Secondary useism: 0.20 μm/s QUICK SUMMARY: Taking shift for TJ as he is out sick today. CFC error on H1ISIBS. Loaded coefficients to clear.Light Pipe UN-shuttered. IMC re-locked at 15:29UTC. Peter to EY to transition to LASER SAFE.