edmond.merilh@LIGO.ORG - posted 08:29, Friday 18 March 2016 (26126)
Shift Summary - Day Transition
TITLE: 03/18 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Mar
CURRENT ENVIRONMENT:
    Wind: 10mph Gusts, 6mph 5min avg
    Primary useism: 0.09 μm/s
    Secondary useism: 0.20 μm/s 
QUICK SUMMARY: Taking shift for TJ as he is out sick today. CFC error on H1ISIBS. Loaded coefficients to clear.Light Pipe UN-shuttered. IMC re-locked at 15:29UTC. Peter to EY to transition to LASER SAFE.