edmond.merilh@LIGO.ORG - posted 15:03, Friday 18 March 2016 - last comment - 15:22, Friday 18 March 2016(26141)
Shift Summary - Day
TITLE: 03/18 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Jeff
SHIFT SUMMARY:'
LOG:
14:27 Peter to EY to transition to LASER safe
15:15 Jim doin comparitive TFs on HAMS 4/5.
15:23 Jeff to EY
16:03 Jeff B back from end stations
16:10 Gerardo and Chandra into LVEA to leak check X and Y manifold
16:18 Fil. Peter Manny out to EX
16:30 Reibolt grouting at EY
18:57 Peter et al back from EX
19:14 Dave Barker into the LVEA
19:20 John and Chandra going into LVEA to open gate valves
19:30 Karen and Christina at EX
20:42 Karen and Christina finished at EX and calling it a day.
21:30 Richard back on site to investigate instrument air issue
21:59 All corner station gate valves are open
21:59 CP7 is yellow and reporting 83.8 John Worden informed
22:24 Richard and Fil back from EY
Comments related to this report
edmond.merilh@LIGO.ORG - 15:22, Friday 18 March 2016 (26142)
Jeff in the control room. He told me he could sail the ship if I wanted to start my weekend a little early.