Richard M, Filiberto C, Peter K, Ed M, Gerardo M.
Lost power to the Y-End station Instrument air compressor.
Initial inspection revealed the circuit breaker had tripped.
Found main lead wires shorted against a stud.
Wires were replaced and power restored to Y-End station Instrument air compressor.
CP7 went into alarm due to the lack of air, but is now recuperating, it reached a low of 81.3% full, as of now is at 86.2% and green.