TITLE: 03/21 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
Wind: 24mph Gusts, 17mph 5min avg
Primary useism: 0.08 μm/s
Secondary useism: 0.30 μm/s
QUICK SUMMARY:Commissioning going on.Guests in the control room include; Jaime, Terra and Stefan