Reports until 16:11, Thursday 24 March 2016
H1 General
edmond.merilh@LIGO.ORG - posted 16:11, Thursday 24 March 2016 (26238)
Shift Summary - Evening Transition
TITLE: 03/24 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Patrick
CURRENT ENVIRONMENT:
    Wind: 31mph Gusts, 19mph 5min avg
    Primary useism: 0.25 μm/s
    Secondary useism: 0.75 μm/s 
QUICK SUMMARY: