Ops Day Shift Summary
14:59 UTC Karen and Christina to end Y
15:07 UTC Jeff B. to LVEA to check on dust monitors and cleanrooms
15:13 UTC Corey checking chillers
15:17 UTC Corey done
15:18 UTC Filiberto installing electronics outside of ISCT1
15:33 UTC Not making it past CHECK_IR. Starting initial alignment.
15:38 UTC Y arm intermittently losing lock on green. Going to 45 Mhz blends on both DOFs at end X and end Y per high microseisem.
15:42 UTC John and Chandra to LVEA to work on vacuum
15:42 UTC Filiberto done
15:48 UTC Hugh, Krishna and Michael starting BRS install at end Y, opening rollup doors (WP 5789)
15:53 UTC Adjusting PR3 to improve COMM beatnote. Y arm still intermittently losing lock on green.
15:55 UTC Jeff B. done
15:59 UTC Can't seem to improve COMM beatnote above 3.8 with PR3. Moving on.
16:24 UTC Done initial alignment.
16:31 UTC Y arm VCO is hitting low limit?
16:40 UTC Jeff B. to HAM6 and beer garden
16:42 UTC Setting end Y ISI blends back to 90 mHz per people walking around in VEA
16:49 UTC Jeff B. done
17:03 UTC Jeff B. to end X and end Y, briefly in VEA at each
17:09 UTC John and Chandra done
17:16 UTC Truck to pickup item from Christina at gate, directed to LSB
17:16 UTC Jason to optics lab to look for part
17:36 UTC Jason back
17:48 UTC Jeff B. back
17:55 UTC Betsy to cleaning area
17:56 UTC Nutsinee to LVEA to look in cabinets
18:11 UTC Nutsinee done
18:13 UTC Terra and Nutsinee to end Y
18:24 UTC Filiberto to end Y to check on cabling requirements
18:41 UTC Filiberto, Hugh, Krishna and Michael back
18:43 UTC Putting IFO_LOCK to down
18:53 UTC Terra and Nutsinee back, did nothing
19:07 UTC Dave, Jim and Carlos to end Y to install BRS computer
19:38 UTC DAQ restart
19:39 UTC Filiberto to end Y to pull cables for BRS
20:14 UTC Filiberto and Peter to end Y
21:58 UTC Kiwamu attempting to lock
21:59 UTC Brynley to electronics bay to look at LEDs
22:05 UTC Brynley back
22:40 UTC Carlos changing vlan for DMT switch in MSR
22:49 UTC Dave shutting down fw0
22:55 UTC Kiwamu giving up on locking. Will lock simple Michelson to measure contrast defect.

Jim B., Carlos, Dave:
Installation of BRS computer at end Y
New PI model on LSC frontend, h1omcpi
Updates to susitmpi, susetmxpi, susetmypi
DAQ restart to add h1omcpi model