Displaying report 1-1 of 1.
Reports until 16:15, Friday 25 March 2016
H1 General
edmond.merilh@LIGO.ORG - posted 16:15, Friday 25 March 2016 (26258)
Shift Summary - Evening Transition

TITLE: 03/25 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Patrick
CURRENT ENVIRONMENT:
    Wind: 11mph Gusts, 5mph 5min avg
    Primary useism: 0.63 μm/s
    Secondary useism: 0.41 μm/s 
QUICK SUMMARY:

Displaying report 1-1 of 1.