TITLE: 03/26 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:' Large tour group in the control room. Got a chance to really talk at length with some guests about my job and a little bit about various subsystems with a camera guided tour around the LVEA. Completed the last ofthe Sat Amp modifications. Did a little bit of re-locking for Sheila. She's going to be working on DRMI/TCS relationships for the remainder of the night.
LOG:
23:21 Chandra back from CP3 refill
00:15 Terra and Nutsinee to EY to do some signal injections
0:46 Terra and Nutsinee back