Reports until 12:50, Monday 28 March 2016
H1 General
travis.sadecki@LIGO.ORG - posted 12:50, Monday 28 March 2016 (26284)
Ops Day shift transition

TITLE: 03/28 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind: 12mph Gusts, 8mph 5min avg
    Primary useism: 0.14 μm/s
    Secondary useism: 0.19 μm/s
QUICK SUMMARY: Arrived this morning to find the IFO unlocked with many things tripped (TMSX, TMSY, ETMY, EY ISI, EX ISI, IY ISI, IX ISI WDs tripped).  It appears this was due to a pair of EQs in Mexico during the night.  Reset all WDs and began initial alignment.