travis.sadecki@LIGO.ORG - posted 16:08, Monday 28 March 2016 (26292)
OPS Day Shift Summary

TITLE: 03/28 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Jim
SHIFT SUMMARY: Struggling to get past DRMI locking most of the day due to ASC issues.  Jenne has been parked in the OPS station helping me out.  An EQ before lunch didn't help and took ~2 hours to ring down.
LOG:
16:26 Jeff B to EX

19:00 Jeff B back

19:19 Karen leaving EY

19:44 Chandra to EX checking pump cart

19:57 Jeff B to EX

19:57 TJ done with charge measurements

21:18 Chandra back, going to MY with John, Bubba

21:26 Krishna and Michael to EY

21:39 Chandra done at EY