BRS-2 Installation DAY 6: COM shifted, new transfer measurements
Krishna, Michael

This morning we stopped pumping on the BRS-2 to add a ~0.57 g washer to the top of the balance which shifted the COM up by ~10 microns. We then resumed pumping and remeasured the transfer function using the piezo stacks we installed yesterday. The attached plot shows the results of the measurements along with the model assuming d=0 microns and d=+/-1 microns. 

Plan for tomorrow:
1. Stop pumping with cart and switch to ion pump
2. Remove piezo stacks
3. Install thermal insulation
Non-image files attached to this report
Comments related to this report
jeffrey.kissel@LIGO.ORG - 10:52, Wednesday 30 March 2016 (26334)SEI
Changing the Section to SEI and tagging SEI in this.

Let us take a second to appreciate this entry (and its companion, LHO aLOG 26298) -- The new-and-improved measurement technique is precise enough to measure the "d," (the separation between suspension point and center of mass) to better than a 1 [um] (recall that with BRS1 we were only able to get -35 +/- 5 microns; see e.g. LHO aLOG 13563)! 

That means we'll get excellent translation rejection from this rotation sensor. Nice work gents!