H1 General
travis.sadecki@LIGO.ORG - posted 16:00, Wednesday 30 March 2016 (26344)
OPS Day Shift Summary

TITLE: 03/30 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Jim
SHIFT SUMMARY: Good day for locking.  Had the IFO as far as DC Readout by 16:30.  Then some QPD and other work took me down.  Since then, we have been back to locking consistently.
LOG:
15:16 Krishna and Michael to EY BRS work

15:41 Bubba driving inside of both arms checking tumbleweeds

16:05 Chandra pump cart work in diagonal

16:26 Fil to EX QPD work

16:27 Karen and Chris done in LVEA

16:40 John and Bubba to LVEA

16:58 John and Bubba out

17:42 Fil and Richard back

17:45 Fil and Ed to LVEA HAM3 cabling

18:08 Fil and Ed out

18:18 Ed to LVEA

18:50 Ed out

19:30 Fil to EX QPD

19:53 Fil done

19:54 Jeff B to both ends

20:11 DAQ restart

20:30 Jeff B back

20:36 Ed to LVEA

20:47 Bubba and Nicole to MY