TITLE: 03/30 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Jim
SHIFT SUMMARY: Good day for locking. Had the IFO as far as DC Readout by 16:30. Then some QPD and other work took me down. Since then, we have been back to locking consistently.
LOG:
15:16 Krishna and Michael to EY BRS work
15:41 Bubba driving inside of both arms checking tumbleweeds
16:05 Chandra pump cart work in diagonal
16:26 Fil to EX QPD work
16:27 Karen and Chris done in LVEA
16:40 John and Bubba to LVEA
16:58 John and Bubba out
17:42 Fil and Richard back
17:45 Fil and Ed to LVEA HAM3 cabling
18:08 Fil and Ed out
18:18 Ed to LVEA
18:50 Ed out
19:30 Fil to EX QPD
19:53 Fil done
19:54 Jeff B to both ends
20:11 DAQ restart
20:30 Jeff B back
20:36 Ed to LVEA
20:47 Bubba and Nicole to MY