TITLE: 04/04 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in PT
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:'
LOG:
5:15 Jeff B. out to HAM6 area prepping clean room
5:27 Hugh out to lock HAM6 HEPI
6:30 Hugh out
7:00 Keita to ISCT6
9:15 Hugh locking up HAM5 HEPI
Keita going back to ISCT6
9:34 Fill to CER to take down roation stage Ethercat chassis. This won't affect PSL power-up work.
9:50 Vern and Fill out of CER (with the chassis).
10:16 Travis head to EY to check PCal.
10:17 Bryn's taking a company around the LVEA. They're informed to not go near HAM6.
10:28 Bryn and a company out of LVEA.
10:37 Bryn an company walking down the arm to EY VEA.
10:48 Jeff B out of the LVEA.
11:00 Travis back
11:35 Peter and Jason to PSL.
12:09 Vacuum team out
12:11 Jeff K restarting H1 OAF model
12:20 Bryn's back
12:35 Betsy to HAM5/6 area
13:13 Jeff B going back to HAM5/6 area
14:26 Jeff B out.
15:09 Fil to Y mid filling out the CP3
15:42 Kyle out working by BSC4
16:39 PSL Team out for the day. HPO fired up without problems.