1/2 open LLCV bypass valve, and the exhaust bypass valve fully open.
Flow was noted after 5 minute and 45 seconds, closed LLCV valve, and 3 minutes later the exhaust bypass valve was closed.
Next over-fill on Monday, April 6th before 23:00 utc.
Wednesday, April 6th