Reports until 16:03, Tuesday 05 April 2016
H1 General
nutsinee.kijbunchoo@LIGO.ORG - posted 16:03, Tuesday 05 April 2016 (26444)
Ops Day Shift Summary

TITLE: 04/05 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:

Peter was already in the PSL and Kyle was already at HAM6 area when I arrived.

15:12 (8:12) Krihna and Michael to EY checking BRS pump

15:25 (8:25) Gerado joining Kyle at HAM6 area.

15:41 (8:41) portable potty here -- they couldn't get through the tumbleweed so I think they turned around and left.

15:47 (8:47) Jason and Ed joining Peter in the PSL

15:49 (8:49) Betsy to Optics lab

16:10 (9:10) Ken the electronics guy to both ends checking air compressor cabinets (if he could get through tumbleweeds).

16:13 (9:13) Keita to HAM6.

16:33 (9:33) HVE-EY:INSTAIR_PT499 alarm handler went off

17:01 (10:01) Travis to LVEA

17:10 (10:10) TJ to HAM6

17:12 (10:12) Travis out

17:19 (10:19) Richard to LVEA

17:20 (10:20) Dave to beer garden checking on ITMY hardware watchdog

17:32 (10:32) Ken back from end stations

17:40 (10:40) Dave out, going to CER to replace WD.

17:53 (10:53) Calos working on the net box in the CER. Will affect the internet.

18:26 (11:26) Calos done

19:05 (12:05) Dave swapping out ITMY WD chassis.

19:08 (12:08) Jason, Peter, Ed out of PSL for lunch.

20:13 (13:13) TJ and Nutsinee to LVEA

22:02 (15:02) TJ out

22:27 (15:27) Nutsinee out

22:40 (15:40) Ed out of the PSL for the day.

22:43 (15:44) Jeff and Jim out of HAM6 for the day

16:02 (23:02) Jason and Peter done for the day. HPO box is left on but the shutter is closed.