(Covering for Nutsinee) 15:43 UTC Joe D. to LVEA to check batteries 15:47 UTC Jeff B. to LVEA to take pictures 15:52 UTC Jason to PSL enclosure 15:54 UTC Corey and Jim W. to HAM6 for ISI work 16:13 UTC Nutsinee to HAM6 17:03 UTC Karen and Chris moving from end Y to end X 17:06 UTC Gerardo to LVEA, H2 vacuum diagonal 17:11 UTC Jeff B. done in LVEA 17:38 UTC Corey done at HAM6. Nutsinee, Jeff K, Jim W. at HAM6 running B&K hammer before measurements related to tuned mass dampers 18:01 UTC Karen and Chris leaving end X 18:09 UTC Kyle to LVEA to remove and replace vibration isolators on vertex turbo pump by HAM5 (WP 5816) 18:54 UTC B&K hammering team out for lunch 19:25 UTC Vern to TCSX table 20:13 UTC Jeff K. and B&K hammering team back in 20:20 UTC Jeff B. and Mitchel to PSL enclosure to work on plumbing for dust monitors 20:26 UTC Joe D. to LVEA 20:30 UTC Nutsinee to HAM6 20:35 UTC Nutsinee back 20:49 UTC Richard and Gerardo to X2-8 to work on ion pump high voltage cable 21:07 UTC Nutsinee to HAM6 21:30 UTC Dick G. to LVEA ISC racks to retrieve lab book 21:53 UTC Corey to HAM6 to drop off tools 22:37 UTC Richard and Gerardo back