Activity Log:All Times in UTC (PT)
15:00 (08:00) – Start of shift
15:41 (08:41) Kyle – Going to End-Y mechanical room
15:52 (08:52) Gerardo – Going into the LVEA looking for cables
15:57 (08:57) Jim & Corey – Going to HAM6
16:05 (09:05) Jeff K. – Going to HAM6
16:10 (09:10) Peter & Jason – Going into the H1 PSL enclosure
16:15 (09:15) Gerardo – Out of the LVEA
16:22 (09:22) N2 delivery to the X-Arm
16:49 (09:49) Richard & Gerardo – Going to End-X
17:10 (10:10) N2 delivery to Y-Arm CP4
17:30 (10:30) Kyle – In LVEA near BSC4 (WP #5817)
18:15 (11:15) Jeff K. – Out of LVEA
18:16 (11:16) Ed – Terminating cables at HAM1, Vertex, and HAM6
18:32 (11:32) Richard & Gerardo – Back from End-X
19:36 (12:36) Filiberto – Going to End-Y mechanical room
20:00 (13:00) Jeff K. – Going into LVEA then Optics lab
20:01 (13:01) Jim – Going to HAM6.
20:15 (13:15) RO alarm – John notified. No alarm – Dave doing burt restore to fix alarm handler
20:41 (13:41) High dust counts at HAM6. Stand down ISI work while Kyle & Jeff were sealing up East Door curtains for door install
21:20 (14:20) Krishna & Michael – Going to End-Y for BRS
21:39 (14:39) Bob's Heating on site to work on VPW HVAC
22:10 (15:10) Kyle, John, Chandra, Jeff – Reinstall HAM6 east door.
23:03 (16:03) Jeff K – Going to HAM6 to install tuned mass dampers
End of Shift Summary:
Title:04/07/2016, Day Shift 15:00 – 23:00(08:00 – 16:00) All times in UTC (PT)
Support:
Incoming Operator:
Shift Detail Summary:Work on HAM6 is going well and should wrap up tomorrow. East HAM-6 Door has been reinstalled.