PSL – The leaking coolant manifold was replaced yesterday. Coolant has been circulating since then with no apparent problems. Today efforts will concentrate on getting the PMC relocked. SEI – The new hardware has been installed and tested. The crew is closing out some final cleanup tasks; then will run a final set of transfer functions. If everything checks out OK, the plan is to hang the last two doors after lunch. Vac – Pumping will start on HAM6 as soon as the doors are back on. Gate Valves should be opened on Monday. FRS – Reviewed and closed out completed FRS tickets.