Displaying report 1-1 of 1.
Reports until 16:18, Wednesday 27 October 2010
H2 INS
cheryl.vorvick@LIGO.ORG - posted 16:18, Wednesday 27 October 2010 (265)
Optics in HAM2 and HAM3 locked Down:
MMT2, MC2, and RM are on earthquake stops.  I used both front and back stops for the small optics, and the South side stops on the RM (opposite the elliptical baffle).

Everyone involved: Cheryl, Betsy, Patrick, Kyle, Ski, Travis, Andres
Displaying report 1-1 of 1.