Displaying report 1-1 of 1.
Reports until 17:20, Thursday 19 April 2012
H2 SEI
hugh.radkins@LIGO.ORG - posted 17:20, Thursday 19 April 2012 (2653)
BSC6 ETMY ISI Condition--Shrouded & Feed Thrus almost all Protected
EricA & Hugh

First we covered the ISI and sealed it to the Walking Plates so we could swap out the Cleanroom softroof.  The ISI remains with this softcover in place.

We then worked on the installing the remaining Electrical Feedthru Protection Shrouds.  There remains two SUS FTs that are not protected but we'll complete those in the morning.  We'll continue with putting the HEPI Actuator into run mode and complete the HEPI Pier Pod wiring for the Actuators and Sensors.

Also, the Dial Indicators are in place and we are ready to suspend the lot on the HEPI Springs.

Of note, I see one of the ICS Feedthrus is installed upside down and this is an issue as the inside of the 25pin feedthru allows one to attempt to install the cable incorrectly and possibly damage the feedthru.  This feedthru should probably be pulled and rotated like all others.