corey.gray@LIGO.ORG - posted 16:04, Monday 11 April 2016 - last comment - 16:17, Monday 11 April 2016(26517)
DAY Ops Summary
Day's Activities:
8:15: Karen checking out HAM6 area
8:49: Running cables for Access System between HAM1-4; most of the day. (Fil & Ed)
8:50: BSC (ETMx) new Controller work ["so can run on CPS only"] (Jim)
9:41: BRS EX code work beginning; most of the day (Krishna & Michael)
9:53: PSL crew doing measurements from outside in the morning and then working in the enclosure in the afternoon.
9:58: EX to check water tank (John)
9:58: EX Beckhoff stopped running last Thurs (Batch notified us & Patrick investigating). Operator note: One can tell if Beckhoff goes down by looking at the Slow Controls section on the CDS Overview....if anything is frozen, it's not running.
"Operator note: One can tell if Beckhoff goes down by looking at the Slow Controls section on the CDS Overview....if anything is frozen, it's not running."
As a reminder, the DIAG_MAIN has a test to look for exactly that. Though, it has become saturated and lit up from all of the vent and PSL work going on.
"Operator note: One can tell if Beckhoff goes down by looking at the Slow Controls section on the CDS Overview....if anything is frozen, it's not running."
As a reminder, the DIAG_MAIN has a test to look for exactly that. Though, it has become saturated and lit up from all of the vent and PSL work going on.