LHO VE
kyle.ryan@LIGO.ORG - posted 17:22, Monday 11 April 2016 (26534)
Progress on annulus ion pumps
Kyle, Gerardo, Chandra

Received HV pump cables and custom length power cords that had been ordered last week -> HAM7, BSC4 and HAM12 annulus pumps started today -> pump carts moved from HAM9 to HAM8 and BSC4 to HAM6. 

Gerardo
Routed and terminated CDS signal cables to HAM7 and HAM12 annulus ion pump controllers

Kyle 
Pumping HAM5/HAM6 annulus volume with pump carts at each pump port -> Energized HAM5 and HAM6 ion pump controllers