C. Cahillane I have generated a C01 and C02 calibration systematic error spectrogram for all of O1. The spectrogram takes the calibration from every day of O1. The frequency vector goes from 5 to 3000 Hz. These plots are preliminary because my veto definer files do not veto all bad times, so I still have to hack together some vetoes of my own. This is mostly a concern for the LHO C01 plots. This will be resolved ASAP. The plots have dashed blue lines at Sep 14 2015, Oct 11 2015, and Dec 26 2015. For reference I have included LHO Dec 26 Uncertainty Budgets for both C01 and C02. These should correspond to the third dashed blue line in the spectrogram. Next, once the vetoes are properly applied, I will post revamped systematic error spectrograms alongside Total O1 Uncertainty Budgets. Without the correct vetoes my Total O1 Budgets are not yet useful. For the LLO All of O1 Calibration Spectrograms, please see LLO aLOG 25618