The airshower has been installed and is now working properly. We can get strong airflow inside, although the seams where the top and bottom join still need to be caulked. The laser and anterooms are being finished up, groove filler is installed and the wall panel gasket will be finished tomorrow. The certification process will finish tomorrow with dust and pressure readings.