Reports until 19:23, Wednesday 13 April 2016
H1 General
nutsinee.kijbunchoo@LIGO.ORG - posted 19:23, Wednesday 13 April 2016 (26577)
Ops EVE shift summary

Ops EVE Shift. All time in UTC.

23:23 Jeff K. to EY to kick on ETMY ESD driver.

23:30 Dave restart SUS ETMX PI and PEM CS (added 2 mic at 16 kHz) models.

23:52 Jeff K. back. Power supply had tripped.

00:50 Nutsinee and Kiwamu walked around the LVEA to check on viewports. All of them are covered. We turned the CO2 controller boxes on so we can do some measurement.

02:23 Everybody's gone home. I think I'm going to end my log here.

 

Also I haven't done the measurement I wanted to do so the CO2 controller boxes are still on (but no output to the test masses. The laser is turned off on medm screen).