Apologies for the late entry.
TITLE: 04/14 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
Wind: 24mph Gusts, 18mph 5min avg
Primary useism: 0.32 μm/s
Secondary useism: 0.66 μm/s
QUICK SUMMARY:
All was quiet in the control room. LASER work in PSL ongoing. Snow Valley on site to clean chillers down X arm.