Reports until 09:45, Thursday 14 April 2016
H1 General
edmond.merilh@LIGO.ORG - posted 09:45, Thursday 14 April 2016 (26588)
Shift Summary - Day Transition

Apologies for the late entry.

TITLE: 04/14 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind: 24mph Gusts, 18mph 5min avg
    Primary useism: 0.32 μm/s
    Secondary useism: 0.66 μm/s 
QUICK SUMMARY: 
All was quiet in the control room. LASER work in PSL ongoing. Snow Valley on site to clean chillers down X arm.