Reports until 16:00, Friday 15 April 2016
H1 General
edmond.merilh@LIGO.ORG - posted 16:00, Friday 15 April 2016 (26614)
Shift Summary - Day
TITLE: 04/15 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Nutsinee
SHIFT SUMMARY:
LOG:

00 Chris down X arm to do beam enclosure sealing. Joe to join later.

15:49 Hugh down X arm to to do inventory.

15:52 PSL team into the enclosure

17:08 Gerardo into LVEA around HAM5/6 - climbing

17:34 Hugh Back

17:43 Mitchell into the LVEA

18:05 Mitchell out of the LVEA

18:18 Mitchell back in to LVEA

19:00 Hugh out to LVEA to unlock HAM 5/6

20:00 Hugh out of LVEA

20:37 Gerardo to LVEA pulling cable to the annulus ion pump of input mode cleaner tube

22:00 Gerardo out for the day

22:18 Gerardo ou to MY for CP3 manual overfill