Displaying report 1-1 of 1.
Reports until 19:05, Friday 15 April 2016
H1 PSL (ISC)
daniel.sigg@LIGO.ORG - posted 19:05, Friday 15 April 2016 - last comment - 19:49, Friday 15 April 2016(26620)
IO and ALS light pipes opened

Comments related to this report
daniel.sigg@LIGO.ORG - 19:49, Friday 15 April 2016 (26621)

The gain of the H1ALS-C-SHG_IR/GR_DC photodiodes needed to be reduced to 20dB each. Comparing the power reading to 14 days ago, we get

Photodetector Before    Now Unit Scaling
H1:ALS-C-SHG_IR_DC 18 54 mW 3.0
H1:ALS-C_SHG_GR_DC 0.13 1.0 mW 7.7
H1:ALS-C_SHG_GR_DC @32.5C   1.1 mW 8.5

SHG temperature started out as 33.5C and was reduced to 32.5C to optmize the new green power.

Images attached to this comment
Displaying report 1-1 of 1.