TITLE: 04/18 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
Wind: 4mph Gusts, 2mph 5min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.25 μm/s
QUICK SUMMARY: The PSL had some issues over the weekend so it seems like that will be worked on today. Many SEI WDs are tripped and a few SUSs.