SEI - Fiddling with the BRS
SUS - All good
PSL - Water flow sensor issue over the weekend. Should be back after the sensor is replaced. ISS investigation.
Vac - Ready to turn on the ion pump. Change the actuator on CP-1. Mid station Beckhoff switch maybe as soon as today.
Fac = Beam tube enclosure sealing on both arms.
There will be no internet from 9-11 NEXT Tuesday. (WP5831)