Kyle, Chandra Verified HAM6 IP was operating and then valved it back into HAM6 chamber at 9e-7 Torr this morning. Immediately valved out turbo pump and will monitor IP and pressure throughout the day to make sure load is not too high for IP supply. Turbo is still ON and ready to be valved back in if need be.