In the week of LVC there was a beam manifold vent (alog 26065). After the volume was pumped down, ITM oplevs were totally off and never came back (attached). (It should be grouting during that week, not the vent itself.)
Basically the beam is in a single quadrant, both for ITMX and ITMY.
It's the oplevs, not the mirrors themselves, as we went to a full power lock while the oplevs are off.
Don't enable oplev damping or do oplev-related measurements until they are centered again.