Reports until 08:02, Wednesday 20 April 2016
LHO General
thomas.shaffer@LIGO.ORG - posted 08:02, Wednesday 20 April 2016 (26676)
Ops Day shift transition

TITLE: 04/20 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind: 5mph Gusts, 2mph 5min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.17 μm/s
QUICK SUMMARY: IMC is locked, ITMX ISI tripped most likely from a handful of large earthquakes in the past 6 hours.