TITLE: 04/22 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Got through initial alignment, then was immediately halted by ISC_LOCK trying to get the ETMX ESD to function. After finding the last remaining person on site (Kiwamu!), he agreed to drive to EX to try and reset the ESD driver. He discovered that it was not a problem with the ESD driver, but an issue with ISC_LOCK not checking all the channels it needed to to get the ESD up and running. Kiwamu edited the ISC_LOCK guardian to check that the requested DC bias was not zero. Then, just as I was starting to continue with locking, there was another 6.0 EQ in Ecuador (haven't they been through enough already?). Kiwamu suggested that with no one else here and the EQ ringing us up over 1 um/s, we should call it a night.
LOG:
23:51 Dave and Jim restarting SUS ETMX PI model
2:45 Kiwamu to EX looking at ESD driver (He noted that he was unable to open sitemap on one of the workstations at EX)
3:10 Kiwamu back
3:45 Calling it a night with the seismic plot going through the roof