Reports until 09:15, Saturday 23 April 2016
H1 INJ (INJ)
christopher.biwer@LIGO.ORG - posted 09:15, Saturday 23 April 2016 (26748)
Turned off INJ-PCALX_HARDWARE filterbank
Chris B., Matt E.

Turned off the INJ-PCALX_HARDWARE filterbank output at 16:07 UTC.

From Today (April 23) to April 27, I plan to test the guardian hardware injection node. Turning off the output of INJ-PCALX_HARDWARE means that no signal will go into the detector.