BSC3 iLigo ITMX Deinstall - progress, but optic is still in the chamber
The deinstall progressed to the point where the lazy susan is in place, the lift table, teflon highway, and adaptor plate are in place.  However, the shoulder bolts for the tall dog clamps have gone missing and were not found.  Some alternatives were considered and rejected, so Apollo crew and Kyle have come up with an alternative that replaces the missing bolts.  The replacements are being cleaned and then baked overnight, so should be ready for use tomorrow, allowing us to complete the deinstall.