Reports until 16:10, Wednesday 27 April 2016
LHO General
patrick.thomas@LIGO.ORG - posted 16:10, Wednesday 27 April 2016 (26827)
Ops Day Summary
Lots of lock losses and FSS oscillations. Sheila and Jenne investigating.
14:15 UTC Chris S. working in LVEA moving barrels from bottom of stairs into the high bay
14:30 UTC Jeff B. to HAM6 and PSL rack
15:00 UTC Chris S. done in LVEA, working in high bay until 17:00
15:17 UTC Kyle to LVEA
15:17 UTC Peter to H1 PSL enclosure
15:28 UTC Jeff B. back
16:24 UTC Filiberto to LVEA to terminate cables for PT170 and PT180 BPG402 gauges
16:54 UTC Kyle back from climbing on HAM11, HAM12, BSC4
17:05 UTC Jamie restarting h1guardian0 for code upgrade
17:12 UTC Christina and Karen to mid Y
Peter done
18:20 UTC Turned on and off PSL noise eater in PSL rack
18:21 UTC Christina and Karen done at mid Y
18:33 UTC Jeff B. to LVEA to check dust monitor cabling
18:56 UTC Dave restarting OMCPI, SUSPI models, DAQ restart
18:58 UTC Jeff K. changing SUS ESD bias
19:19 UTC Filiberto out for lunch
19:21 UTC Jeff B. out of LVEA
19:26 UTC Sheila to LVEA to investigate FSS oscillations
19:39 UTC Filiberto to LVEA to continue cable work
19:53 UTC Gerardo to end Y to replace electric LLCV motor fuse
19:55 UTC Sheila back, made no changes
20:11 UTC Gerardo changed CP7 electric LLCV motor fuse, going to mid Y to overfill CP3, then end X
20:17 UTC Joe to LVEA to track down view port equipment
20:19 UTC Jeff B. to turn on dust monitor at PSL
20:48 UTC Gerardo changed CP8 electric LLCV motor fuse
20:48 UTC Filiberto done
21:00 UTC Jeff B. done
21:47 UTC Gerardo to BSC4 to look at PT140 cabling
22:20 UTC Gerardo back
23:03 UTC Gerardo to LVEA to measure PT140 voltage at vacuum rack