Lots of lock losses and FSS oscillations. Sheila and Jenne investigating. 14:15 UTC Chris S. working in LVEA moving barrels from bottom of stairs into the high bay 14:30 UTC Jeff B. to HAM6 and PSL rack 15:00 UTC Chris S. done in LVEA, working in high bay until 17:00 15:17 UTC Kyle to LVEA 15:17 UTC Peter to H1 PSL enclosure 15:28 UTC Jeff B. back 16:24 UTC Filiberto to LVEA to terminate cables for PT170 and PT180 BPG402 gauges 16:54 UTC Kyle back from climbing on HAM11, HAM12, BSC4 17:05 UTC Jamie restarting h1guardian0 for code upgrade 17:12 UTC Christina and Karen to mid Y Peter done 18:20 UTC Turned on and off PSL noise eater in PSL rack 18:21 UTC Christina and Karen done at mid Y 18:33 UTC Jeff B. to LVEA to check dust monitor cabling 18:56 UTC Dave restarting OMCPI, SUSPI models, DAQ restart 18:58 UTC Jeff K. changing SUS ESD bias 19:19 UTC Filiberto out for lunch 19:21 UTC Jeff B. out of LVEA 19:26 UTC Sheila to LVEA to investigate FSS oscillations 19:39 UTC Filiberto to LVEA to continue cable work 19:53 UTC Gerardo to end Y to replace electric LLCV motor fuse 19:55 UTC Sheila back, made no changes 20:11 UTC Gerardo changed CP7 electric LLCV motor fuse, going to mid Y to overfill CP3, then end X 20:17 UTC Joe to LVEA to track down view port equipment 20:19 UTC Jeff B. to turn on dust monitor at PSL 20:48 UTC Gerardo changed CP8 electric LLCV motor fuse 20:48 UTC Filiberto done 21:00 UTC Jeff B. done 21:47 UTC Gerardo to BSC4 to look at PT140 cabling 22:20 UTC Gerardo back 23:03 UTC Gerardo to LVEA to measure PT140 voltage at vacuum rack