MC1 Assembly Notes

[Jeff B, Deepak K, Andres R and Gerardo M2]

Monday & Tuesday 23rd/24th April 2012

 - The wires for the lower mass was assembled and assembled to the intermediate mass.

 - The Lower mass was hung on the loop after properly placing the wires in the grooves.

 - The intermediate mass is then hung on the lower blades.

 - The Lower blades are then hung freely from the upper blades.

 - The masses were initially aligned and now waiting to be properly aligned.

 - The suspension is fully assembled and all the masses are freely suspended.