TITLE: 04/28 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: TJ
SHIFT SUMMARY: Relocked the IFO to DC Readout by 15:45 UTC. At ~20:00 UTC, we got nailed by a 7.0 EQ in Vanuatu and have been down since. Jim and Rich have been using the downtime to work on EY ISI, and various commissioners have been doing offline tasks as well.
LOG:
16:00 Jeff B in and out of cleaning bay all day
16:50 Fil to MY
16:30 Jim and Rich starting EY ISI work
17:36 Fil back
18:00 Chandra to GV7
18:00 Jeff B to both ends mech. rooms
18:33 Jeff B back
19:59 EQ hits, trips all ISI platforms and a few SUSes