TITLE: 04/28 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Travis
CURRENT ENVIRONMENT:
Wind: 17mph Gusts, 7mph 5min avg
Primary useism: 0.39 μm/s
Secondary useism: 0.25 μm/s
QUICK SUMMARY: Earthquake hit little over 3 hours ago and we have been ringing down since. Some rotation stage work is going on in the mean time.