Reports until 16:08, Thursday 28 April 2016
LHO General
thomas.shaffer@LIGO.ORG - posted 16:08, Thursday 28 April 2016 (26860)
Ops Eve Shift Transition

TITLE: 04/28 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Travis
CURRENT ENVIRONMENT:
    Wind: 17mph Gusts, 7mph 5min avg
    Primary useism: 0.39 μm/s
    Secondary useism: 0.25 μm/s
QUICK SUMMARY: Earthquake hit little over 3 hours ago and we have been ringing down since. Some rotation stage work is going on in the mean time.