Displaying report 1-1 of 1.
Reports until 19:33, Tuesday 24 April 2012
H1 PSL
oliver.puncken@LIGO.ORG - posted 19:33, Tuesday 24 April 2012 (2687)
Disassembly of the PSL (Part 2)
PSL installation team


pulled back the pump light fibers from LAE to Diode room and disassembled them from the diode boxes. They are coiled now and ready to be put into the new rail between the H1 LDR and the H1 LAE.

Moved cables and electronics from the H2 racks next to the H2 LAE to the H1 racks

Installed the PSL water manifold underneath the (new) optical table. The manifold for the "table water" (powermeters, etc.) is not installed yet, because the CPC connectors are not self-sealing (so they are leaking, if nothing is connected to them). Also, the pressure valve for this circuit needs to be mounted to the new filter cartridges.

Since laser diode rack is not going to be moved in one piece, we started to get the shelves into the new laser diode rack (to be continued).
Displaying report 1-1 of 1.