TITLE: 04/29 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: TJ
SHIFT SUMMARY: Due to PSL being down, not much in the way of OPS or Commissioning activity. Some rotation stage work by commissioners.
LOG:
16:14 Kyle to HAM 5
16:21 Kyle out
16:43 Kyle to EX VEA
17:18 Kyle back from EX, going to EY
18:00 Kyle back
20:27 Richard to LVEA
20:32 Chandra overfilling CP3
21:02 Ed to PSL
21:45 Jim and Rich to CER looking at ITMy electronics
22:15 Joe to LVEA to retreive cable
22:26 Joe out