Reports until 16:00, Friday 29 April 2016
H1 General
travis.sadecki@LIGO.ORG - posted 16:00, Friday 29 April 2016 (26886)
Ops Day Shift Summary

TITLE: 04/29 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: TJ
SHIFT SUMMARY: Due to PSL being down, not much in the way of OPS or Commissioning activity.  Some rotation stage work by commissioners.
LOG:

16:14 Kyle to HAM 5

16:21 Kyle out

16:43 Kyle to EX VEA

17:18 Kyle back from EX, going to EY

18:00 Kyle back

20:27 Richard to LVEA

20:32 Chandra overfilling CP3

21:02 Ed to PSL

21:45 Jim and Rich to CER looking at ITMy electronics

22:15 Joe to LVEA to retreive cable

22:26 Joe out