Displaying report 1-1 of 1.
Reports until 08:49, Tuesday 03 May 2016
H1 General
edmond.merilh@LIGO.ORG - posted 08:49, Tuesday 03 May 2016 (26955)
Shift Summary - Day transition
TITLE: 05/03 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind: 6mph Gusts, 2mph 5min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.15 μm/s 
QUICK SUMMARY: Maintenance Day!
 
Ed sitting in for Cheryl for the first hour or so.
 

14:30 

15:24 The portable toilet people are on site

15:45 Joe into LVEA

15:49 Jeff B added 200ml to the Xtal chiller

15:50 Jeff B to End stations

15:50 No L4C watchdog counts for me to reset. Perhaps It was done by someone else this morning?

Displaying report 1-1 of 1.