TITLE: 05/03 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
Wind: 6mph Gusts, 2mph 5min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.15 μm/s
QUICK SUMMARY: Maintenance Day!
Ed sitting in for Cheryl for the first hour or so.
14:30
-
Jeff B Testing all dust monitors: LVEA, Optics Lab, LDR, Both Ends to Zero count + Flow. Test all Dust Monitors
-
Rick and Peter going into PSL
-
Christina: escorting Pest control folks to replace traps in LVEA
15:24 The portable toilet people are on site
15:45 Joe into LVEA
15:49 Jeff B added 200ml to the Xtal chiller
15:50 Jeff B to End stations
15:50 No L4C watchdog counts for me to reset. Perhaps It was done by someone else this morning?